Tutum Energy
  • ABOUT TUTUM ENERGY
  • NEWS
  • Services
    • Reporting, audit & controller systems
      • Omni Systems
      • Kora Konnekt
    • Energy & carbon reduction services
      • Voltage optimisers
      • M2G Intelligent boiler load
      • Coolnomix
    • Water management solutions
  • CONTACT US
Tutum Energy
  • ABOUT TUTUM ENERGY
  • NEWS
  • Services
    • Reporting, audit & controller systems
      • Omni Systems
      • Kora Konnekt
    • Energy & carbon reduction services
      • Voltage optimisers
      • M2G Intelligent boiler load
      • Coolnomix
    • Water management solutions
  • CONTACT US
Oct 06

Kelloggs

  • October 6, 2022
  • energyAdmin
  • VO CaseStudy
ECO – MAX PAID FOR ITSELF IN ONLY 21 MONTHS, REDUCING THEIR
ANNUAL ELECTRICITY BILL BY £37,500 PER ANNUM

Show more
Kelloggs have been working for years to continually improve their environmental performance, specifically looking at reducing their energy use, greenhouse gas emissions, water use and waste sent to landfill sites.
Part of this process involved surveying the facility, with a view to identifying actions to reduce energy consumption. It became clear that voltage optimisation would be beneficial in reducing the Manchester facility’s energy consumption and offer considerable cost savings too.

Data logging allowed us to measure consumption and provide baseline figures. During this process it became clear that the site suffered from large loading swings which made it unsuitable for standard forms of fixed voltage optimisation. Voltage optimisers were used to optimise the voltage to a single piece of equipment, localised area or an entire building. They can be supplied with fixed or variable outputs, with or without power factor correction. In this instance a voltage tracking (stabilised) optimiser was designed to deal with the specific issues identified, and to achieve the maximum possible energy saving. The unit was installed and further data logging carried out to measure the savings.

Saving Results:

Reduction in Consumption PA – 463,176 KWh

Reduction in Electricity Cost PA –£40,226.84

Reduction in CO2 Emissions PA –243 Tonnes

Total Project Cost – £71,061.52

Payback Period-21.2 Months

Show less
  • Facebook
  • Twitter
  • Reddit
  • Pinterest
  • Google+
  • LinkedIn
  • E-Mail

About The Author

Comments are closed.

© 2016 Unicon v2 · WordPress Theme built by Mintithemes using WordPress.