Tutum Energy
  • ABOUT TUTUM ENERGY
  • NEWS
  • Services
    • Reporting, audit & controller systems
      • Omni Systems
      • Kora Konnekt
    • Energy & carbon reduction services
      • Voltage optimisers
      • M2G Intelligent boiler load
      • Coolnomix
    • Water management solutions
  • CONTACT US
Tutum Energy
  • ABOUT TUTUM ENERGY
  • NEWS
  • Services
    • Reporting, audit & controller systems
      • Omni Systems
      • Kora Konnekt
    • Energy & carbon reduction services
      • Voltage optimisers
      • M2G Intelligent boiler load
      • Coolnomix
    • Water management solutions
  • CONTACT US
Oct 06

Viridor

  • October 6, 2022
  • energyAdmin
  • VO CaseStudy
9% average power (kWa) reduction achieved by the ECOMAX,
equating to a financial saving of £212,852 per year,
with a project payback of 3.6 months!

Show more
The Bolton TRF was looking for viable ways to make substantial energy savings. One of the technologies considered by the onsite engineering team was power optimisation.Voltage optimisation and power factor correction offer two different, but complementary power saving techniques.

Voltage optimisation directly reduces the amount of power drawn by the connected equipment by supplying it at a voltage nearer to its design voltage, whereas Power factor is a way of describing how efficiently electrical power is consumed.

The installation of an ECO – MAX combined voltage optimisation and power factor correction unit reduced the total amount of power drawn which translated into additional generator export revenue for the site.

Prior to installation a detailed site survey was carried out together with datalogging to obtain base information. The site was then logged again following installation and comparisons made.

Show less
  • Facebook
  • Twitter
  • Reddit
  • Pinterest
  • Google+
  • LinkedIn
  • E-Mail

About The Author

Comments are closed.

© 2016 Unicon v2 · WordPress Theme built by Mintithemes using WordPress.